Okavango River Bridge In Mohembo Village

Botswana, Africa

Centrally located is a 0.45m high spine beam. The cable-stayed bridge is supported by 72 cables anchored to the two 54m high main pylons and made of truncated cone sections of steel of variable diameter and thickness that resemble the shame of elephant tusks. The total weight is 4,400 t. AMC is proud to announce our successful execution of about 15,000lm bridge deck crack repair works.

Contact Us

1 + 15 =

ADDRESS

AUH OFFICE: EMI State Tower Bldg. No. 3, Office 101, Airport Road, Abu Dhabi, UAE

DXB OFFICE: Smart Heights Bldg., Office 2201, Barsha Heights, Dubai, UAE

CONTACT NUMBERS

AUH OFFICE: Tel : +971 2 622 2820 | Fax: +971 2 622 2830
DUBAI OFFICE: Tel : +971 4 553 1590

EMAIL ADDRESS

info@amc-protection.com